Octopus Energy Daikin Heat Pump Installation - Day 3
The day has finally come for our Daikin Altherma 4kW (EDLA04E2V3) heat pump to be installed. The whole process has been managed by Octopus Energy. You can follow the journey so far (My heat pump journey with Octopus Energy - Part 1, My heat pump journey with Octopus Energy - Part 2 - Planning Permission)
Day 3
Day 4
Day 5
The plan for the day was, drain down the old radiators that needed to be swapped. Install the two new radiators. Continue with the piping and tanks in the loft. The electrician would continue the work to commission the heat pump. We are still on the temporary immersion.
Loft before the tanks were installed
New buffer tank
Loft pipework
Hot water tank pipework
Hot water tank pipes and electrical going to and from the loft
Hot water tank pipes and electrical
Daikin MMI controller
One of the two new radiators fitted in the lounge