Octopus Energy Daikin Heat Pump Installation - Day 1
The day has finally come for our Daikin Altherma 4kW (EDLA04E2V3) heat pump to be installed. The whole process has been managed by Octopus Energy. You can follow the journey so far (My heat pump journey with Octopus Energy - Part 1, My heat pump journey with Octopus Energy - Part 2 - Planning Permission)
The delivery arrived around 7.20am with the Octopus crew arriving around 8am, Charlie, Ryan and Tarek. Unfortunately the delivery driver managed to drop the new tank. The Octopus team decided to take no chances and got another one brought to site.
The team started on the base for the heat pump. This was done while the electrician ran the power from the front of the house to the back.
Good progress was made as the day went on. All the work done today was outside. The power has been run from the front to the rear and some of the pipes have been run toward where the tank.
These are the boxes that were delivery. There were also come copper pipes and lagging.